We process your declaration responsible for minor work type A in Marbella
We process your declaration responsible for minor work type A, where it is not necessary to submit extra technical documentation to the form and your identification. Provided that your reform is within the following parameters:
A.1. Coatings and finishes (painting, plastering, plastering, cladding, flooring, waterproofing…) on vertical and horizontal walls, both interior and exterior of the building that as a whole does not exceed 500 m2 of surface, which do not require means to work in height.
A.2. Opening and modification of openings in walls of walls or partitions, as well as small modifications of the partitioning without modification of distribution or change of use, which affect a single dwelling or premises, and the surface of said openings is less than 100 m2.
A.3 Interior installations of buildings (electricity, water, sanitation, gas, telecommunications, air conditioning, security systems…) that affect a single dwelling or premises, with an area of less than 300 m2.
A.4. Cleaning and clearing of lots that does not involve earthworks and does not alter the natural level of the land.
TO 5. Solar fencing using posts and metal mesh.
A.6. Maintenance and upkeep of the existing plot enclosure without changing its dimensions, design or position.
A.7. Maintenance and upkeep works for swimming pools and sports courts.
A.8. Punctual repair of flat roofs, as well as terraces and balconies that do not require means to work at height.
A.9. Improvement and reinforcement of insulation in walls and floors that does not alter the thickness of the walls or the existing free height.
A.10.Cleaning, scraping, painting and finishing of facades or dividing walls, as well as repair of plaster on walls, placement of cladding, modification of coatings and/or replacement of facade moldings, skirting boards and similar elements, which do not require means to works at height, nor do they represent an essential variation of the general exterior composition.
A.11. New placement of interior carpentry, even varying the size of the openings, which does not alter the number or arrangement of the habitable parts
A.12. Placement of locksmith elements or their replacement by others with similar characteristics or dimensions, except railings, which do not require means for work at height.
A.13. Carrying out non-destructive tests on existing buildings, aimed at conservation or rehabilitation works.
A.14. Conditioning of free plot spaces consisting of landscaping works, paving, patio floors, perimeter sidewalks, placement of curbs on land for private use that does not affect any public service or facility or general conduits, nor does it involve earthworks or alteration of the natural slope of the land.
FREQUENT QUESTIONS
How much does it cost to process my building license?
There are already many building licenses obtained from the Marbella town hall, so we know all the paths and obstacles that can be found.
What type of license do they process?
What is a responsible declaration?
Personal identification that I must upload.
How long does it take to obtain a work permit?
Address
Marbella
Shift
M - F: 8am - 9pm S - S : 9am - 8pm
Contact
+34 693 012 256
info@marbellarenovation.es
Links
Masonry - Electricity Plumbing - Carpentry Painting
Marbella Renovation - All the rights are reserved - Cokkies - RGPD - Legal Policy